Quality and export preparation

Discuss material records before order confirmation

Specify the required grade, standard, document format and traceability expectation. Availability is confirmed per order.

Request a Quote →

What to confirm

Application, material, dimensions, finish, quantity, documentation and destination should be confirmed before quotation.

Order-specific evidence

Documentation, samples, inspection and packing are confirmed for the specific order.

Mill Traceability Proof

Original Mill Barcode Tags & Mechanical Test Reports

Every master coil retains original mill barcode tags with heat number, chemical batch, and mechanical properties traced directly to EN 10204 3.1 Mill Test Reports.

Hongwang original mill barcode tag and coil heat traceability
Heat Traceability

Original Mill Barcode Label

Prime mill barcode tracking linking gross weight, net weight, coil ID, and metallurgical melt number.

Rockwell hardness test gauge verification
Mechanical Testing

Rockwell Hardness Certification

Direct Rockwell HRB hardness verification correlating directly with MTR tensile and elongation test values.

FAQ

What should I include in an enquiry?

Include application, material, dimensions, quantity, finish and delivery destination.

Can I attach a drawing?

Yes. Attach DWG, DXF, STEP, STP, IGS or PDF where available.